Our History

2001

Sapanca Kadipinar Houses

It was started in July 2001 and finished in December 2001 in Kadipinar area located in the summit of natural life in Sapanca in a plot of 3000 m2 and 11 block 2 twin duplex villas. Each villa has a total area of 150 m2. Interior walls and ceiling were mainly made of wood. The perimeter walls, the iron railings on the wall and the automatic lawn irrigation system are located together with landscaping.

2004

Manolya Villas 1

The project in Bahcecik region with the fresh air of Kocaeli the frontal area with greenery started as a residential projection in June 2004 and was completed in September 2005 and delivered to the owners. The site which is established on a 4500 m2 area, consists of 6 twin blocks and 12 duplex villas. Each villa has a gross area of 185 sqm and has a fireplace, barbecue , patio and storage area suitable for multipurpose use in 15 sqm. The site is located in a communal area with a children’s play area , a 150 m2 fully automatic swimming pools, a sunbathing area and parking area. The safety of the site is provided by the cameras and by the security unit at the entrance of the site.

2007

Manolya Villlas 2

Manolya Villas 2 project which has the same architecture as Manolya Villas 1 project is located at Atakent neighborhood Basiskele and started in September 2007 and completed in April 2010 and delivered to the owners. The site which is established on 8500 m2 area, consists of 15 twin blocks and 30 duplex villas. Each villa has a gross area of 185 m2 and has a fireplace , barbecue and patio in the villas. The site is located in the common area with the children’s playground, outdoor sports area, ornomental pool and parking area arrangement. The safety of the site is provided by the cameras and by the security unit at the entrance of the site.

2008

Cengiz Topel Airport’s Kitchen

Cengiz Topel Airport’s Kitchen Repair Work, which has been put out for presented to the tender by GOLCUK NAVY COMMANDER MAINTENANCE REPAIR has been left in our company’s premises and has been delivered to the site in July 2008 and completed in October 2008. The existing 500 m2 kitchen area, all interrior , exterior, ceiling and wall surfaces, mechanical and electrical systems in military airspace have been completely demolished and rebuilt according to the project.

2009

Gebze Balcik Village Stream Reclamation

Gebze Balcik Village Stream Reclamation works, which has been put out for presented to the tender by Kocaeli Municipality ISU General Directorate has been left in our company’s and started to work in March 2009. The project was completed fast in September 2009. The project consists of 1050 metric tons of reinforced concrete 2 meter wide section, 1050 mt 300 mm grooved pipe channel and 2100 mt curtain wall iron railings.

2009

Yesilkent Health Clinic

Yesilkent Health Clinic Building Work, which has been put out for presented to the tender by KOCAELI PROVINCIAL ADMINISTRATION, has beeb left in our company an started to work in June 2009. After the completion of the construction in September 2009, it was delivered to Kocaeli Basiskelle Health Department directorate and presented to the people of the region. It was built using reinforced concrete construction technique. In total there is a single health clinic with a construction area of 300 m2.

2010

Korfez Agadere Stream Reclamation

Korfez Agadere Stream Reclamation works, which has been put out for presented to the tender Kocaeli Great City Municipality General Directorate of ISU, has beeb left in our company and started to work in March 2010. The project was completed fast in October 2010. The project is made up of 1400 mt reinforced concrete wall with stone wall section 7 -11 m wide , 2000 mt 800 mm steel reinforced concrete vehicle bridges and 2800 mt stone wall iron bars.

2011

K.B.B. Tepekoy Cultural Center

Tepekoy Cultural Center, which has been put out for presented to the tender Kocaeli Great City Municipality, has been left in our company and the place has been delivered and started to work in January 2011. The project was completed fast in June 2012 and presented to the use of the people of the region. In the project which is constructed using reinforced concrete aand steel construction technique, aluminum composite panel coating, structural silicone curtain wall facade systems were used exterior wall facades. The total construction area of the cultural center KOMEK is 2200 m2 and it consist of 2 blocks as a wedding hall. The KOMEK section is 3 floors and includes vocational courses and administrative departments that local people can takr advantage of . All kinds of wedding and organization services are provided in the Wedding Hall section of 650 seats.

2011

Ust Group Demka Business Center

Ust Group Plaza project in which the head office of the Ust Group construction and Demka construction is located is started in August 2011 and completed in June 2012 . In the project which is constructed using reinforced concrete and steel structure technique, aluminum composite panel coating and structural silicone curtain wall facade systems were used as exterior facades. The plaza building which has a total construction area of 1000 m2, consists of 3 floors.

2012

Alikahya Vocational High School

Alikahya Professional Laboratory Workshop Work which has been put out by the Kocaeli Provincial Administration has been left in our company place delivery and started to work in November 2011. The project which is fast so build, was completed in August 2012 and started its education and training period.
The vocational school, which has a total construction area of 2200 m2, also has 7 motor technology workshops. The school, which is composed of 3 floors, is a basement canteen and a multipurpose hall with a capacity of 100 people. On the other floors there are workshops and administrative sections. The ceremonial space in the garden of the school is accompanied by the landscaping of the benches.

2012

K.B.B. Kurucesme Cultural Center

KURUÇEŞME KÜLTÜR MERKEZİ, which has been put out for sale by KOCAELİ GREAT CITY MUNICIPALITY, has started to work in March 2012 with the delivery of the place. The construction project was completed in July 2013 and it was put into use for the people of the region.
The project, which was constructed by using reinforced concrete and steel structure technique, was constructed on the facade by using the travertine mechanical curtain wall covering as the exterior wall coverings and the belts and knives in the Seljuk architecture as precast building elements.
The cultural center, which has a total construction area of 3500 m2, consists of 5 basements, 2 basement floors + ground floor + 1 normal floor. 1. On the basement there is an amphitheater with full acoustic, professional sound and lighting systems that can be used as a wedding / conference room for 150 people.
On the ground floor there is a 600 sqm hall where weddings and similar societies can be held. 1. Professional classes with KOMEK courses on the normal floor, protocol rooms on the other floors, 2 350 m2 sports hall and administrative units. Professional systems such as vrf and roof-top are used in the mechanical heating, cooling and ventilation systems of the cultural center. The cultural center also has a car reception area and a car park.

2012

Tavsantepe Primary School

TAVŞAN TEPE PRIMARY SCHOOL, which has been issued by KOCAELİ PROVINCIAL ADMINISTRATION, has started to work in May - 2012 with the delivery of the firm.
The project is fast-paced and is completed in December - 2012 and started its education and training period. In the project, which is constructed using reinforced concrete and steel structure technique, mantle, aluminum composite panel coating and structural silicone curtain wall systems were used as exterior facades.
The school, which has a total construction area of 5500 m2, has 24 classrooms and a capacity of 700 students. The school, which is composed of 5 floors, has a basement canteen and gymnasium, a multipurpose hall with a capacity of 160 people on the attic, and a library and administrative sections on the other floors. In the garden of the school, the ceremonial space is accompanied by basketball and volleyball playgrounds, sitting benches and pergolas landscaping.

2013

ISU Basiskele Service Building

ISU BAŞİSKELE ABSTRACT DISTRICT SERVICE BINAS, which has been issued by the GENERAL DIRECTORATE OF OZGUN MUNICIPALITY OF GREAT CITY OF KOCAELİ, has started to work in March - 2013 with one and one place delivery.
The construction is fast and the project is completed in September - 2013 and presented to the use of the people of the region. In the project which is constructed using reinforced concrete and steel structure technique, aluminum composite panel coating and structural silicone curtain wall facade systems were used as exterior facades. The service building, which has a total construction area of 500 m2, consists of 2 floors.

2013

Ustpark Seymen

The project, which is located in the Seymen district of Başiskele, which is the front line with clean air of Kocaeli and greenery, started as a housing project in May - 2013 and was completed in August - 2014 and delivered to the owners. The site, which is located on an area of 5000 m2, consists of 5 blocks and 40 duplex apartments (20 garden duplexes and 20 roof duplexes). The site has a children's playground, a decorative pool, sitting benches and a car park. The safety of the site is provided by the cameras and by the security unit at the entrance of the site.

2013

S.B.B. School Building With 32 Classes

SAKARYA BÜYÜKŞEHİR MUNICIPALITY has been brought to the tender for the SAKARYA IMAM HATIP LIBRARY BUSINESS, our firm has been completed and the place has been delivered and started to work in May - 2013.
Construction is fast and the project is completed in August - 2014 and started education and training period. The project, which was constructed using reinforced concrete and steel construction technique, was built on the facade by using arches and knives in the Seljuk architecture as exterior facades using precast structural elements.
The school has a total construction area of 11000 sqm and has 32 classrooms and a capacity of 1000 students. The school consists of 5 floors, a basement, a canteen and a gym, a multipurpose hall for 200 people on the roof and classrooms and administrative sections on the other floors. In the school garden, the ceremony area is accompanied by basketball and volleyball playgrounds, sitting benches and pergola landscaping.

2013

Masukiye Villa

Construction of two independent duplex villas in a 2000 m2 plot in the area of MAŞUKİYE which is one of the beautiful living areas of Kocaeli started in September - 2012 and completed in June - 2013. Each of the villas has a usage area of 200 m2 and a swimming pool of 50 m2 fully automatic system belonging to each villas is made. Perimeter walls, iron railings on the wall, lighting and automatic lawn irrigation system are included with landscaping.

2013

Mimar Sinan High School Gymnasium

İZMİT MİMAR SİNAN LİSES CLOSED SPORTS SALOON, which has been issued by the KOCAELİ PROVINCIAL ADMINISTRATION, has been left in our company and started to work in May - 2013.
The project is fast-paced and the project is completed in November - 2013 and is available for the use of the high school in the area. In the project, which is constructed using reinforced concrete and steel construction technique, as stated in the floor report and static project, the foundation system is strengthened with 100 pcs 3m deep and 30cm mini piles. The gym consists of a single floor with a construction area of 750 sqm and includes a 600 sqm basketball and volleyball field for professional use, male and female changing rooms, showers and referee rooms.

2014

Indoor Athletics Area

KOCAELİ ATHLETICS PICTURE CONSTRUCTION WORK, which has been issued by KOCAELI PROVINCIAL ADMINISTRATION, has been left in our company and the place has been delivered and started to work in February - 2014.
The project was completed fast and the project was completed in August - 2014 and it was put into use by the Kocaeli youth sports provincial directorate. The project was built using reinforced concrete and steel construction technique.
The project has a usage area of 2500 m2 and it consists of single storey and two storey. The first part is made as an administrative part and includes canteens, male and female showers, changing rooms and administrative units. In the second part, there is a 2000 m2 athletics track with special rubber floor covering in accordance with international standards. There are many sports competitions and trainings in the track such as throwing, hammer throwing, javelin throwing, disc throwing, long jump, hiking, marathon and so on.

PRESENT
TOP